I have learned some more news on the new house. Now, I know some will totally go off due to the changes and think it's not right as we have a signed contract, but it's the way it is.
The tile will not be put down into the extension until after we get more money in the future. The doorbell with flashing lights and signalers for me, will not be installed. This next week, the exterior will be painted, the bathrooms completed and the appliances brought in once the electric is turned on. All interior paint will be touched up and finished.
I bought the kitchen faucet today and the contractor has it. He was surprised at what I bought and couldn't believe it did not cost a bunch. I was lucky today at Lowe's. We will find out from contractor what will be done about the A/C in the extension. I suggested to hubby that we paint the floor and seal it in the extension. This way it doesn't look unfinished. MIL thinks that's a waste of money, but it's my house, not her's.
All in all, I am not losing out on much more than I expected. The cost of a lot of the materials really went up and up. I verified at Lowe's and Home Depot on these increases and they sat down with me, contractor and hubby and went over everything over the last year with their prices and such. Most of what is causing all these problems is the fact that we had to have this extension. While it was nice, it was not in the original plans and required quite a bit more in funds. The tile was going to be another $2-3000.