just done it now, and staying on coke...
and probably will sleep early tonight
was
now
on the side at the edge for the drain, yet to wait concrete to set then line and tuck novaflow pipe then bury, (and to remove boxing wood to bury in the edges)
im stuffed now.., I didnt actaully do the concrete scraping, leveling, my mate did, for a $100, i did the shoving into mixed and carrying over the load by wheel barrow, and before he arrived, I offload almost 3 tons on metal and carried over 280kg ov cement...dont like it but had to do it.
glad the job is done, now i have to wait a bit then do the fence and gates not too difficult to do.
thats is enough for 1 day.