- Joined
- Mar 24, 2008
- Messages
- 14,503
- Reaction score
- 21
Now, moving on, we have filling in the hole with the septic tank, and then the area for the drain field lines, then, it's all leveled out, ready for grading and sod. Then moving onward, we have the pad laid out for the extension. Part of rebar in place. Water line dug, and then a long view of the water line. Finally, a massive tree root ball from a 100 foot or so palm tree that we cut down. These last 4 pictures were from today, before the rain hit.