Reply to thread

How so?  To my understanding the sequence a house is built in is fairly consistent and only varies slightly and that has more to do with scheduling the trades as opposed to design.  But please correct me if I am wrong. 


I can see how in a pre-fabrication scenario robots can do the job.  Quality control would insure everything is corret.


Back
Top