- Joined
- Feb 27, 2003
- Messages
- 4,224
- Reaction score
- 139
In the next couple of days I will be moving AllDeaf to another server. And when this happens, the site will be down until the move is complete. So, if you can't access AllDeaf sometime next week, don't think you were banned.
Once AllDeaf is in the process of moving, things around here will be a little out of whack (images broken, missing posts, etc.). Please bear with me.
To those that have a web account with me, I will back up all your files and then move them to the new server for you. I will email you once your site is in place.
For the past few weeks, AllDeaf has been experiencing downtime on and off due to high CPU loads. Therefore, it is important and necessary that I move AllDeaf to another dedicated server to rectify the problem.
Server specs:
- Dual AMD Opteron 248 Processors
- 2 GB ECC RAM
- (2) 73 GB SCSI Hard Drives (10K RPM)
- CentOS 3.x Operating System
- WHM/CPanel Control Panel
- 100Mbps Uplink Port Speed
Once AllDeaf is in the process of moving, things around here will be a little out of whack (images broken, missing posts, etc.). Please bear with me.
To those that have a web account with me, I will back up all your files and then move them to the new server for you. I will email you once your site is in place.
For the past few weeks, AllDeaf has been experiencing downtime on and off due to high CPU loads. Therefore, it is important and necessary that I move AllDeaf to another dedicated server to rectify the problem.
Server specs:
- Dual AMD Opteron 248 Processors
- 2 GB ECC RAM
- (2) 73 GB SCSI Hard Drives (10K RPM)
- CentOS 3.x Operating System
- WHM/CPanel Control Panel
- 100Mbps Uplink Port Speed